Stylized ASIC floorplan visualization showing macro block placement, standard-cell rows and routing in teal, blue and orange
ASIC Physical Design

ASIC Physical Design Services

Move your ASIC or SoC design from its agreed handover stage toward a completed physical layout. Seminovaa supports floorplanning, placement, clock tree synthesis, routing and engineering change orders, with power, timing and physical constraints considered throughout implementation.

Define the stages your team needs, the responsibilities Seminovaa will own and the criteria for the next handoff.

Coverage

Physical Implementation from Floorplan to Routed Layout

Physical layout of a chip showing memory macros, standard-cell placement and power and signal routing

Floorplanning

Establish the layout foundation. Review block and macro arrangement, available area, interfaces and routing considerations against the design constraints.

Placement

Place and optimise standard cells while addressing timing, congestion and available area. Review the trade-offs as the design becomes more physically defined.

Clock Tree Synthesis

Build the clock distribution network and address the timing implications of clock delivery within the agreed implementation flow.

Routing and ECO Implementation

Complete interconnections, address routing issues and apply engineering change orders. Track implementation changes through closure and the agreed handoff.

For detailed timing, physical verification and power integrity checks, explore ASIC Signoff Services.

Getting Started

Start with a Clear Design Handover

The starting point determines the work package. Review the available design data and agree which inputs are ready, which need clarification and who will provide them.

  • Current design stage and the RTL, netlist or implementation database available.
  • Timing constraints, clock definitions and operating scenarios relevant to the scope.
  • Technology, library and physical-design information available through authorised access.
  • Floorplan requirements, interfaces, power intent and project priorities where applicable.

Agree entry criteria before scheduling implementation milestones. Keep the initial enquiry high level; exchange detailed design material through an approved confidential process.

Deliverables

Agree the Outputs Before Work Begins

Specify the required handoff for each stage. Depending on the work package, it can include an updated implementation database, layout output, supporting reports, ECO records and the status of outstanding items.

For work extending through tapeout preparation, define the GDSII handover and required signoff acceptance criteria explicitly. Manufacturing, packaging and production testing remain outside this engagement. Define any pre-silicon DFT responsibilities separately within the project scope.

Next Step

Discuss Your Physical Design Work Package

Tell us the stage your design has reached, the implementation support you need and your intended schedule. Our team can discuss the available inputs, scope ownership and next technical conversation.