ASIC Signoff Services
Seminovaa provides ASIC signoff services covering static timing analysis, physical verification and power integrity checks. We support design teams working through timing violations, DRC/LVS results and EM/IR findings before tapeout.
Define the checks, analysis conditions and closure responsibilities your program needs, then agree the engineering work package with our team.
Timing, Physical Verification and Power Integrity

Static Timing Analysis and Timing Closure
Analyse timing against agreed constraints and operating scenarios. Review setup and hold violations, investigate critical paths and support the ECO work needed to address timing issues. Recheck the updated design against the agreed signoff conditions.
DRC and LVS Verification
Review layout compliance with applicable design rules and compare extracted connectivity with the reference netlist. Investigate reported violations and mismatches, coordinate corrections and rerun the affected checks.
Electromigration and IR Drop Analysis
Assess power integrity through electromigration and IR drop analysis. Review reported hotspots and violations with the implementation team, identify required design changes and check their effect on the analysis results.
Define the Checks and Track Their Resolution
Establish the Analysis Baseline
Agree the design revision, constraints, libraries, rule decks, operating scenarios and acceptance criteria relevant to the assigned checks.
Investigate and Resolve Findings
Separate issues requiring design changes from setup or input problems. Agree corrective actions and ownership with the engineering team, then repeat the relevant analysis on the updated revision.
Review the Evidence for Handoff
Bring results together for technical review. Record checks completed, remaining findings and customer-approved exceptions against the agreed release criteria.
Agree the Inputs and Signoff Deliverables
For the first discussion, outline the design stage, checks required, current closure issues and intended review schedule. Technical handover can then establish the relevant netlist or layout database, timing constraints, libraries, parasitic data and verification setup through an approved confidential process.
Agree the deliverables: analysis reports, issue tracking, closure status and a handoff summary identifying open items and approved exceptions. Release approval and foundry requirements follow the agreed engagement.
Need implementation work as well? Explore ASIC Physical Design Services.
Discuss Your Signoff Requirement
Tell us which checks need support and where closure is currently blocked. Seminovaa can discuss the engineering scope and next steps with your team.
Keep your initial message high level. Please do not send confidential design files through the enquiry form.